Absorption-tower safeguards.
ABOUT / PROCESS
Manufacturing clarity builds packaging confidence
A controlled, traceable route from raw material to finished fluorinated packaging.
addition ,we also have a fluorinated plastic/rubber production line with the capacity of 50 million sets per year,which can fluorate all kinds of automobile fuel tank , plastic and rubber products
The company owns 88 employees ,and technical personnel among them 22 people,who have many years experience within the special gases industry.
The company resolutely implements the principle of ‘Quality first,Reputation first’,we enforce rigorously the standards agreed by relevant State and Government departments.and we have passed the quality ,environment and occupational health and safety management system certification in June 2011.
We promised,the requirement of customers is our pursuits
Calipers, gauges and safety valves.
Finished goods stored at the production site.
PRODUCTION ROUTE
Manufacturing process
No outsourced processing. Core steps remain under direct quality control.
- 01Raw materialsHDPE 5502 / 5401 · Masterbatch
- 02Mixing and meltingControlled masterbatch ratio
- 03Blow moldingStable molding parameters
- 04Mixed-gas preparationFluorine absorption tower protection
- 05Controlled fluorinationSealed process control
- 06Nitrogen washingResidual gas removal
- 07TrimmingOffcuts and rejects separated
- 08Inspection, packing and storageQualified products warehoused
Finished-product yield per ton of raw material
20%Offcuts and rejects sent for compliant disposal
FACILITY
People, equipment and storage
Shift operation
Two shifts with 12 people per shift.
Warehouse
One warehouse at the production site.
Equipment
Forklift, pressure vessel and required measuring equipment.